Friday, January 23, 2026
Space & Astronomy
6 min read

Amentum Guides Artemis II Rocket & Orion Rollout for NASA Launch

marketscreener.com
January 19, 20263 days ago
Amentum Leads Successful Artemis II Rollout in Critical Preparation Phase of NASA Launch

AI-Generated Summary
Auto-generated

Amentum successfully rolled out NASA's Artemis II Space Launch System rocket and Orion spacecraft from the Vehicle Assembly Building to Launch Complex 39B. This critical preparation marks a significant step for the upcoming crewed mission, which will send four astronauts on a lunar journey. Amentum engineers and technicians operated the crawler-transporter, ensuring precise coordination and safety during the multi-hour transport.

Amentum led a major milestone for NASA's Artemis II mission with the successful rollout of the Space Launch System (SLS) rocket and Orion spacecraft from the Vehicle Assembly Building (VAB) to Launch Complex 39B (LC-39B) at Kennedy Space Center. The rollout marks a key step in final preparations for the crewed Artemis launch. During the mission, the Orion crew capsule will carry four astronauts on an approximately 10-day journey around the Moon and back. It will be propelled by the SLS, the most powerful and capable rocket NASA has ever built. During rollout operations, Amentum engineers and technicians played a central role in operating the crawler-transporter, the massive transporter used to move the mobile launch platform with the fully stacked SLS and Orion from the VAB to LC-39B. The multi-hour journey required precise coordination, continuous systems monitoring, and close integration with multiple teams to safely transport NASA's most powerful rocket. Under NASA's Exploration Ground Systems (EGS) program, Amentum is providing engineering, technicians, and systems integration for Artemis II. Amentum is responsible for maintaining and modernizing ground equipment, integrating and testing launch vehicles, and supporting launch, recovery, and overall operations for Orion and the SLS. The crawler-transporter is a cornerstone of NASA's ground infrastructure, designed to carry the SLS and Orion over several miles, including up a slope to the pad surface, at a carefully controlled pace and with extreme precision. Amentum's role in operating and sustaining the crawler reflects decades of experience in high-con sequence ground operations and mission-critical systems at Kennedy Space Center. Artemis II is scheduled to launch early this year. With the successful rollout, NASA and Amentum have moved to the next major phase of this critical mission, including pad integration activities, final checkouts, and launch readiness activities.

Rate this article

Login to rate this article

Comments

Please login to comment

No comments yet. Be the first to comment!
    Artemis II Rollout: Amentum's Key Role in NASA Launch Prep